Supply Chain & Logistics
94,000 Sq. Ft. Warehouse — Supply Chain & Logistics
CIPL II, MIDC Phase 1, Mahalunge, Pune 410501

Requirement
A supply chain and logistics operator required a large-format warehouse in Mahalunge with efficient truck circulation and dock access to serve the Chakan-Pune distribution network.
Solution
CIPL developed a 94,000 sq. ft. warehouse in MIDC Phase 1, Mahalunge, designed for logistics throughput and leased directly on a long-term basis.
Facility
- 94,000 sq. ft. built-up warehouse
- Layout planned for pallet storage and cross-dock movement
- Truck-friendly internal circulation and yard space
- Location within Mahalunge, close to the Chakan-Talegaon road network
Outcome
The warehouse has been in continuous use for supply chain and logistics operations since handover.
Facility Snapshot
- Built-up Area
- 94,000 sq. ft.
- Industry
- Supply Chain & Logistics
- Location
- CIPL II, MIDC Phase 1, Mahalunge, Pune 410501