Requirement

A heavy fabrication manufacturer serving the defence, aerospace and construction equipment sectors required a large-format industrial shed in Chakan MIDC with the structural clearances and access needed for heavy assembly and crane-based material handling.

Solution

CIPL developed a 100,000 sq. ft. industrial shed on its own land in MIDC Phase 2, Sawardari, engineered for heavy manufacturing use and leased directly to the occupier without an intermediary broker.

Facility

  • 100,000 sq. ft. built-up industrial shed
  • EOT crane-served bays for heavy fabrication and assembly
  • Wide-span structural steel construction with high clear height
  • Direct MIDC road access for heavy vehicle movement

Outcome

The facility has been operating as a heavy fabrication unit for the defence, aerospace and construction equipment sectors since handover.

Facility Photographs

Wide-span industrial shed interior with overhead EOT crane at the CIPL I facility
Conference room at the CIPL I heavy fabrication facility
Open office space at the CIPL I heavy fabrication facility
CIPL-branded shop floor at the CIPL I heavy fabrication facility, Sawardari

Facility Snapshot

Built-up Area
1,00,000 sq. ft.
Industry
Defence, Aerospace & Construction Equipment Fabrication
Location
CIPL I, MIDC Phase 2, Sawardari, Pune 410501